Press Release – General Assembly Month 30 1 4 downloads
|
Communication Toolbox
|
12 January 2026
|
Download
|
Extract of Del. 3.1 Report on the optimization of media conditions and strain selection to maximize PHBV production 1 9 downloads
|
Public Deliverables
|
4 November 2025
|
Download
|
Extract of Del. 7.8 Report on ELLIPSE management tool, monitoring web platform, and end-user digital tool Part I 1 0 download
|
Public Deliverables
|
4 November 2025
|
Download
|
Extract of Del. 7.6 Regulatory, Legal, and Safety Analysis – Part I 1 0 download
|
Public Deliverables
|
4 November 2025
|
Download
|
Extract of Del. 7.3 Report on economic and environmental feasibility study including an LCC, LCA and TEA – Part I 1 4 downloads
|
Public Deliverables
|
4 November 2025
|
Download
|
Extract of Del. 7.1 Report on process modelling and simulation of ELLIPSE including an integral technical evaluation – Part I 1 0 download
|
Public Deliverables
|
4 November 2025
|
Download
|
Extract of Del. 6.2 Report on optimal conditions of pressure membrane technologies for nutrient recovery from digestate 1 3 downloads
|
Public Deliverables
|
3 November 2025
|
Download
|
D8.10 Data Management Plan (DMP) Update 1 2 downloads
|
Public Deliverables
|
25 August 2025
|
Download
|
D8.9 Data Management Plan (DMP) 1 1 download
|
Public Deliverables
|
25 August 2025
|
Download
|
D8.3 Communication, Dissemination & Exploitation plan – Mid-term 1 9 downloads
|
Public Deliverables
|
25 August 2025
|
Download
|
D8.2 Communication, Dissemination & Exploitation plan – Initial 1 0 download
|
Public Deliverables
|
25 August 2025
|
Download
|
D8.1 Project Website 1 0 download
|
Public Deliverables
|
25 August 2025
|
Download
|
D2.3 Report on the optimization of VFA production from slaughterhouse waste and pulp and paper waste by variation of different process parameters 1 4 downloads
|
Public Deliverables
|
25 August 2025
|
Download
|
D2.2 Report on the technical parameters selected for the production of VFAs from sludges from pulp and paper in membrane reactors 1 3 downloads
|
Public Deliverables
|
25 August 2025
|
Download
|
D2.1 Report on the application of different waste stream fractions, pretreatments and the corresponding analytical data for characterisation 1 4 downloads
|
Public Deliverables
|
25 August 2025
|
Download
|
Press Release – General Assembly Month 24 1 1 download
|
Communication Toolbox
|
28 July 2025
|
Download
|
#RunningintheELLIPSE campaign – Carousel 1 5 downloads
|
Communication Toolbox
|
28 July 2025
|
Download
|
Press Release – General Assembly Month 18 1 10 downloads
|
Communication Toolbox
|
13 November 2024
|
Download
|
Waste2Value Factsheet 1 6 downloads
|
Communication Toolbox
|
23 October 2024
|
Download
|
ELLIPSE Poster at ECOMONDO 2024 1 4 downloads
|
Communication Toolbox
|
24 September 2024
|
Download
|
ELLIPSE Poster at ECOMONDO 2023 1 14 downloads
|
Communication Toolbox
|
3 November 2023
|
Download
|
ELLIPSE Roll up 1 15 downloads
|
Communication Toolbox
|
24 September 2024
|
Download
|
ELLIPSE Poster 1 17 downloads
|
Communication Toolbox
|
24 September 2024
|
Download
|
ELLIPSE Brochure 1 42 downloads
|
Communication Toolbox
|
24 September 2024
|
Download
|
ELLIPSE – General Project Presentation 1 55 downloads
|
Communication Toolbox
|
24 September 2024
|
Download
|